Investment fields
Promising investment area Tsimlyansk area
Situation Plan |
Evaluation costs of providing investment platform engineering and transport infrastructure
№ p / n |
engineering and transport infrastructure |
current situation |
Brief description |
Evaluation money and time spent on the reconstruction of engineering and transport infrastructure area |
Power engineering and transport infrastructure reconstruction after |
|||||
estimated cost PIR and SMR at current prices (thousand) |
implementation period, taking into account the development of the CAP and CMP |
|||||||||
PIR |
SMR |
PSD |
SMR |
|||||||
1. |
Power |
Free capacity there 13,6 MW
|
To join
considered site, you must install the control box on the border of the land in terms of CH2 voltage (10 kV).
|
17648,42 |
2 years |
13,6 MW |
||||
2. |
Gasification |
Free capacity there 26 thousand cu. m / h
|
connection possible to the industrial zone of gas pipelines, subject to adjustment design scheme of gas supply area with the load of industrial zone. Approximate length of the pipeline for gas supply is 1,2 km .
|
3 600,00 |
2 years |
26 thousand cu. m / h
|
||||
3. |
Water
|
Free capacity available 2,0 th cu. m / d |
Construction of water supply, extent 0,7 km connecting to existing networks Tsimlyansk
|
800,00 |
2 000,00 |
4 months. |
4 months. |
2,0 th cu. m / d |
||
Wastewater |
Free capacity available 2,0 th cu. m / d |
Construction of delivery-gravity collector D-200-300, length 2,0 km connecting to the sewer of Tsimlyansk city
|
3 000,00 |
20 000,00 |
8 months. |
8 months. |
2,0 th cu. m / d |
|||
4. |
Transport infrastructure |
Entrance to the site is not present |
building entrance to the platform length 0,05 km on local roads Nekrasov Street |
100,00 |
1250,00 |
4 months. |
1 month. |
0,05 km Category 3 |
Поделиться: |