Investor roadmap

Homepage > Information > Archive > Investor roadmap

Guide for investor

1. Introduction. Brief information about the resource and economic potential of the Rostov region.

1.1. Introduction

1.2. Resource potential of the Rostov region.

1.3. The economic potential of the Rostov region.

1.4. Priorities of economic development of the Rostov region

2. The main arguments and advantages confirming the economic feasibility of investing in the creation of new enterprises (or industries) in the Rostov region.

2.1. Competitive advantages of the Rostov region.

2.2. Information on the forms of state support for investment activity in the Rostov region and the regulatory legal acts governing investor support.

3. Legal forms of doing business.

3.1. General Provisions

3.2. Individual entrepreneurs

3.3. Legal entities

3.3.1. Business partnerships.

3.3.2. Business companies.

3.3.3. Production cooperatives (artels)

3.3. Determining the location of a legal entity and type of initial property

3.4. Determining the location of a legal entity and type of initial property

3.5. Criteria for the recognition of enterprises and entrepreneurs as small businesses

3.6. Positive and negative sides of legal forms

3.6.1. General Provisions

3.6.2. Individual entrepreneur

3.6.3. Limited liability company

3.6.4. Closed Joint Stock Company

3.6.5. Public corporation

4. The procedure for registration of individual entrepreneurs and legal entities

4.1. General Provisions

4.2. The procedure for registering individual entrepreneurs

4.3. The procedure for registration of legal entities

4.4. Registration of a legal entity with foreign investment

5. Scheme of sequential actions of the investor to implement the project.

6. The approximate structure of the business plan of the investment project.

6.1. The structure of the business plan of the investment project.

6.2. The structure of the rationale for investment in the project.

7. The procedure for the allocation of a land plot for the implementation of an investment project, including the procedure for transferring a land plot from category to category.

7.1. The procedure for the allocation of land for the implementation of the investment project.

7.1.1. General Provisions

7.1.2. The procedure for the provision of land for the construction of land owned by state or municipal property.

7.1.2.1. Provision of land for construction of land owned by state or municipal property.

7.1.3. The flowchart for the provision of land for the construction of land owned by state or municipal property

7.2. The selection of land for construction.

7.3. Decision on the provision of land for construction

7.4. Transfer of land from category to category.

7.4.1. Transfer of lands of settlements to lands of other categories and lands of other categories to lands of settlements.

7.4.2. Transfer of land from the category of agricultural land to another.

7.4.3. The flowchart for the transfer of land from the category of agricultural land to another

8. The procedure for the preparation of design estimates.

8.1. General Provisions

8.2. The flowchart for the preparation of design estimates

8.3. The composition of the design documentation

8.4. The list of types of works on engineering surveys, on the preparation of project documentation, on construction, reconstruction, overhaul of capital construction facilities that affect the safety of capital construction facilities

8.4.1. General Provisions

8.4.2. Types of engineering surveys

8.4.3. Types of work on the preparation of project documentation

9. The procedure for issuing construction permits (excluding housing).

9.1. General Provisions

9.2. Issuance of building permits in the Rostov region.

9.2.1. General Provisions

9.2.2. Authorities issuing construction permits.

9.2.3. Registration of building permits.

9.2.4. Maintaining a regional database of capital construction projects.

9.2.5. Construction Permit Form

9.2.6. Flowchart for issuing a building permit

10. The procedure for issuing permits for commissioning a capital construction facility.

10.1. General Provisions

10.2. Documents required to make a decision on issuing permission to put an object into operation.

10.3. Grounds for refusal to issue permission to put the facility into operation.

10.4. Issuance of permits for putting objects into operation for construction in the Rostov region.

10.4.1. General Provisions

10.4.2. Authorities issuing permits for putting an object into operation.

10.4.3. Issuing permits for putting an object into operation.

10.4.4. Maintaining a regional database of capital construction projects

10.4.5. Permission form for commissioning an object.

10.4.6. Flowchart for

ArrowTop